Control Sazan is capable of combined cycle power plant establishment for various capacities, based upon the engineering specialists and executive experts, going along with local and foreign reputable suppliers’ cooperation.
The approach for the execution of the power plant projects is within EPC scheme and the collaboration. Currently, some parts of the power plant equipment have been constructed within Control Sazan is going to perform the power plants projects with the best quality within the shortest period of time by supplying the main equipment from reputable foreign sources as well as localization